Configuring send time optimization in the Wait node

This topic describes how to enable and configure the send time optimization in the Wait nodeCampaign: Item that determines when a recipient passes through the campaign, and the actions that are executed for the recipient. With the help of "connections", you can link nodes to specify the process of your campaign. The arrow at the end of each connection always points to the next node and the associated action. within Smart CampaignsOptimizely feature for sending out one-shot-campaigns, such as an event invitation or special Christmas offers..

Once configured, your message is sent to recipients with sufficient behavioral data at a personalized send time. Recipients who lack sufficient behavioral data receive your message at the fallback time.

  1. Under Send date, specify a fallback.
  2. Enable send time optimization.
  3. Select the maximum length of time for the send time optimization.
  4. Adjust the start and end times of the send time optimization and, if necessary, shorten the preset maximum length.
  5. Check your settings in the info area.

Image: Configure sent time optimization

Specifying a fallback time

If there is insufficient data about individual recipients to determine a personalized send time, your message is sent to these recipients at the set fallback time. To specify a fallback time, perform the following steps:

  1. In the Create Campaign window or the Edit Campaign window within Smart Campaigns, drag a Wait node from the left action pane into the workspace between the Recipients node and the Email node.

    Image: Wait node

    A context menu opens.

    Image: Wait node context menu

  2. Under Send Date, select an option and specify the fallback time.

    Image: Specify fallback time

    OptionThe fallback time is set to Configuration
    Wait until ...A fixed time. Specify a date and a time.
    Wait until import has been finishedImmediately after the recipient import is completed.No configuration needed
    Start at ... after import has been finishedA fixed time after the recipient import is completed. Specify a time.

    The Wait until import has been finished and Start at ... after import has been finished options are only available if the closed-loop interface is configured in your client. If the closed-loop interface is not configured, only the Wait until ... option is available.

    If the Wait until import has been finished or Start at ... after import has been finished option is selected, you cannot enable the campaign.

Enabling send time optimization

In the context menu, select the check box next to Send time optimization.

Image: Enable Send time optimization

The Wait node's context menu includes:

  • options for maximum length (24 hours or 7 days)
  • a date slider
  • an info area

Setting maximum length of time

Click 24 hours or 7 days.

Image: Set maximum time

Adjusting start and end times

You can adjust the start and end times of the send time optimization in 15-minute increments. If you make no changes, the start and end times are set so that the fallback date is the midpoint of the selected maximum length of time.

Image: Start and end times

To adjust the start and end times without changing the maximum length of time, click the arrow keys on the sides of the date slider or adjust the slider using the computer mouse.

Image: Time slider

To adjust the start and end times and reduce the maximum length of time, click and grab the corresponding date tab with the computer mouse.

Image: Date tabs

You can adjust the 24 hours and 7 days defaults downwards and shorten the maximum length of time from 7 days to 3 days. You may want to do this for editorial purposes or short-term promotions.

Checking settings in the info area

Your current send time optimization settings appear in the info area. After completing the configuration, verify your settings in the info area, and change them if necessary.